Everything you need to run a job in MyJa Studio — from the coordinate abstract to the printed sheet. Written for surveyors, not for developers. Skim the section you need; ignore the rest.
MyJa Studio has three workspaces — Computation, Area, and Cartography. The order below is the order that works. You can jump straight to Area if you only need parcel areas, or straight to Cartography if you only need a sheet. But for a fresh JRJ, do it in this sequence.
Press NEW JRJ in the top navigation or on the welcome page. Fill in every field marked with an asterisk: County, District, Estate, Block, Plot, Purpose of survey, Field Surveyor Name, 10-digit Contact, and Coordinate Reference System. The email field is optional.
County and District are searchable lists — type the first few letters
and pick from the dropdown. The Contact must be exactly 10 digits, no
spaces, no +256 prefix.
Pick how many known datum controls frame your traverse. This decides which rows of your abstract become the fixed controls:
| Method | How the abstract maps to controls |
|---|---|
| Two | CM1 = first row, CM2 = second row |
| Three | CM1, CM2, CM3 = first three rows |
| Four | CM1, CM2 = first two rows. CM3, CM4 = last two rows. |
| Six | CM1–CM3 = first three rows. CM4–CM6 = last three rows. |
You can switch the count later from inside the computation workspace without re-uploading anything.
Drop a CSV or XLSX on the dropzone. Format rules are in section 2. The app reads the first sheet only. Minimum six valid points.
Press COMPUTE JRJ. The app calculates the datum, then produces the link traverse. Two modes:
After compute, review the metrics, the closure table, the field notes, and the traverse map. Fix anything that looks wrong and recompute. Each results block — Datum Result, Traverse Computation Sheet, and Field Notes — collapses when you click its heading, so a long traverse stays readable.
Switch to AREA COMPUTATIONS. Upload a DXF of closed parcel polylines. Turn on INTERACTIVE SELECTION and tap parcels on the drawing. Selected parcels appear in the left rail with their areas, and the residue against the outer boundary is calculated live.
Rename any parcel by typing in the left rail. The name flows through to the area schedule, the vertex schedule, and the cartography sheet.
Switch to CARTOGRAPHY. The DXF carries over from Area Computations automatically. Pick the CRS (this is the coordinate reference system the survey was computed in), choose the paper size, set the scale, and configure the layers.
The seven rail panels on the left correspond to seven things you can change: the DXF source, the CRS, the map sheet, the coordinate grid, the design elements, the annotations, and the export quality. Edit any of them and the live map on the right updates.
From Computation you can export the JRJ report as PDF or XLSX. From Area Computations you can do the same — the export includes both the traverse and the area schedules. From Cartography you export the cadastral sheet as a PDF at the paper size you selected.
Three columns, in this order:
| Column | Content | Example |
|---|---|---|
| 1 | Station name (text) | CM1 or KLA001 |
| 2 | Northing (number) | 10450.235 |
| 3 | Easting (number) | 312000.500 |
A header row is allowed but not required — non-numeric rows are skipped automatically. The minimum is six valid points. Duplicate station names are rejected with an error, because two stations sharing a name would break the traverse chain.
The parser reads these entity types:
| Entity | How MyJa Studio treats it |
|---|---|
LWPOLYLINE, POLYLINE |
Closed ones become parcels. Open ones are virtually closed (see FAQ). Fewer than 3 vertices becomes a reference line. |
TEXT, MTEXT |
Read as labels. A label whose anchor sits inside a parcel becomes that parcel's name. |
LINE |
Drawn as a dashed grey reference line. Not selectable. |
ARC, CIRCLE |
Ignored. Standalone arcs and circles are not drawn, not selectable, and do not contribute to any area. |
SPLINE |
Drawn from fit points (or control points if fit points are missing) as a reference line. |
| Everything else | Ignored. |
Reference lines are drawn in the preview and on the cartography sheet, but you cannot select them, and they do not contribute to any area. They are context — road edges, streams, existing boundaries — not parcels.
| Key | Action |
|---|---|
| + or = | Zoom in |
| − or _ | Zoom out |
| F | Fit the whole page or map |
| Ctrl+Z | Undo (Cmd+Z on Mac) |
| Ctrl+Y | Redo (Cmd+Y on Mac) |
| Ctrl+Shift+Z | Redo (alternate) |
| Esc | Dismiss popovers and pickers |
| Key | Action |
|---|---|
| Alt+A | Go to Area Computations |
| Alt+C | Go to Cartography |
| Alt+T | Scroll to the traverse results |
| Alt+W | Back to Welcome |
All Alt-key shortcuts are ignored while the cursor is in a text field, so typing never triggers navigation.
The polyline was not closed in the DXF. The app reports this in the UNCLOSED POLYLINES panel on the left rail and virtually closes it — a straight line from the last vertex back to the first — so an area can be calculated. Turn the row off in the panel to exclude that polyline from area computation entirely.
A straight edge drawn between the last and first vertices of an open polyline, so the shoelace area formula has a closed ring to work with. It is what the app uses in place of the boundary segment that was missing from the DXF. It is correct if the missing segment really is a straight line. It is wrong if the missing segment follows a curve or another parcel. When in doubt, close the polyline in CAD and re-upload.
It is determined by the survey, not by the app. A two-control link traverse is the common case — CM1 and CM2 at the top of the abstract, everything between them computed. Three, four and six control configurations exist for surveys framed by more known points. If you are unsure which your job needs, check the survey instructions or ask the supervising surveyor.
Coordinate mode derives everything from the uploaded coordinates. The result is exact by construction — it is a computed layout, not field data. Total-station mode takes the FL/FR readings, slope and zenith you enter from your field book and adjusts the traverse using Bowditch or Transit rules. Use total-station mode when you have real field observations. Use coordinate mode when you want to check a known layout.
Residue = outer boundary area minus the sum of every parcel inside it. If the residue is negative, either the outer boundary does not contain all parcels, or a parcel is being double-counted, or a hole was not detected. Check the outer boundary selection in the Drawing Setup panel and check the warnings for any negative residue alerts.
The hole detection rule requires that the inner polyline has no TEXT or MTEXT label of its own. If the inner island is labelled, it is treated as an independent parcel, not as a hole in the parent. This is intentional — a labelled island is usually a real plot, not excluded ground. If you need it treated as a hole, remove the label from the DXF and re-upload.
Yes. Open SAVED JOBS, load the job, make your changes, and press SAVE JOB again. You will be asked to confirm overwriting the existing saved copy.
There are two QRs, and they carry different things.
The QR on the Cartography sheet (top-right of the Ministry header) carries the export date and the app slogan. It is a printed record that the sheet came out of MyJa Studio, nothing more.
The QR on the JRJ report PDF (the Computation and Area exports) carries the job metadata — county, district, estate, block, plot, purpose, surveyor, contact, and the export date. It is stamped on every page so a loose sheet can always be traced back to its job.
Neither QR links to a website. MyJa Studio does not host your data publicly.
Yes, until you sign in. Everything runs in the browser and saves to your device first. Signing in adds cloud sync across devices, but the app continues to work offline after that — jobs are held locally and pushed to the cloud when the connection returns.
Sign in with the same Google account on both devices. Jobs sync
automatically. If you want to move them without signing in, open
SAVED JOBS and press EXPORT on the
first device, then IMPORT on the second. That
produces a single .json file containing every saved
job.
Cloud sync uses Google Firestore under your own account. If your internet drops mid-sync, jobs are held locally and pushed on the next connection — nothing is lost.
The app loads the ExcelJS library on demand the first time you export. If the connection drops during that load, the export fails. Reload the page and try again — the library is cached after the first successful load.
Those are reference entities — LINE,
SPLINE, or polyline segments with fewer than three
vertices. Roads, streams, existing boundaries, and anything else
drawn as a line. They are shown for context but cannot be selected
and do not contribute to any area. You can turn them off in
Cartography under MAP DESIGN → Roads & reference
lines.
Standalone ARC and CIRCLE entities are
ignored entirely — they are not drawn at all. If you need a curve
on the sheet, draw it as a bulged polyline segment; those still
render smoothly.
If only one polygon sits under the cursor, a single tap selects it — no popup, no delay. Tap it again to deselect.
If two or more polygons are stacked, the app opens a small picker listing every polygon under the cursor with its name, area, and a tick for the ones already selected. Pick the one you want, or dismiss the picker with Esc.
If you already know the stacking order, hold Ctrl, Alt, or Cmd while clicking to cycle through the stack silently — the picker does not appear.
Both are printed in the JRJ report PDF and are also available from the Field Notes block inside the Computation workspace.
Switch between them with the two buttons above the Field Notes table. Your choice is saved with the job.
It appears under the abstract and pre-fills the standard Index to Computations entry for the district in your job metadata — height above sea level, mean-sea-level correction, standard scale factor, and the multiplication factor that combines them.
If the district is not in the built-in table, the block hides itself and nothing is written to the report. Districts are matched by exact name or by normalised name (spaces, hyphens and underscores are ignored). There is no substring fallback — a wrong row on a Ministry submission is worse than no row at all.
It is the ratio of the total traverse length to the linear misclosure. A precision of 1:5,000 means the misclosure is one unit of length per five thousand units of traverse. Higher is better.
The pass threshold is set by the Linear precision spec field in the Total-Station tolerance bar. In coordinate mode the traverse closes exactly by construction, and the banner reads "Exact".
Two dropdowns sit above the table, on the same row as the Parcels heading.
The metric cards above the table always reflect the full selection, regardless of which layer you are currently viewing.
When a parcel contains two or more DXF labels inside its boundary, the app offers them as a picker instead of guessing. Every label whose anchor falls inside the parcel appears in the list. Pick the one you want, or type a name in the left rail input — both update the same value, and it flows through to the area schedule, the vertex schedule, and the cartography sheet.
If only one label sits inside the parcel, that label is used directly and no dropdown appears.
What changed, and when. Newest first. Every entry is dated; nothing is auto-generated.
312500 instead of
312500.000.LINE, SPLINE,
two-vertex polylines) render in the DXF preview and on the
cartography sheet. Standalone ARC and
CIRCLE entities are now ignored entirely.